Eleven Discs Discbound Paper, Junior Size Project Planning Sheets by ElevenDiscs

Eleven Discs Discbound Paper, Junior Size Project Planning Sheets

$29.62
Skip to product information
Eleven Discs Discbound Paper, Junior Size Project Planning Sheets by ElevenDiscs

Eleven Discs Discbound Paper, Junior Size Project Planning Sheets

$29.62
Shipping calculated at checkout.

Product Overview

The Eleven Discs Discbound Paper, Junior Size Project Planning Sheets - Premium 120gsm Heavyweight Notebook & Planner Refills - 8 Discs, 5.5 x 8.5 in - Punched for Circa, Arc, TUL (50 Sheets) approaches daily routines from a quality-first angle, with quality build and reliable performance. measuring 5.5 x 8.5 Inches, available in Project Planning. Notable features include project planning and planning get, contributing to its reliable character.

Key Features

  • PROJECT PLANNING – Get organized and finish your projects at work, home, or school with our Project Planning Sheets!
  • FOCUS ON NEXT ACTIONS – Each Junior Project Planning page contains 4 project description lines, 15 lines for notes, and 10 lines for next actions, each with a completion checkbox.
  • HEAVYWEIGHT PAPER – Each pack contains 50 sheets of bright white, super smooth, acid-free, heavyweight 32lb bond (120 gsm) discbound notebook filler paper. Despite being uncoated, due to its thickness our paper is fountain pen friendly and can handle many inks without bleed through, ghosting, or feathering.
  • JUNIOR SIZE – 5.5 × 8.5 in. – Compatible with Levenger Circa, Staples Arc, Office Depot TUL, Martha Stewart, Talia, and other 8-disc Junior-sized disc bound notebook systems and planners. Prepunched filler paper, no hole punch required.
  • MADE IN USA – Our paper is sourced from mills in the United States. To maintain our standards, our sheets are designed, punched, and packaged in house.

Why Choose the Eleven Discs Discbound Paper

What distinguishes the Eleven Discs Discbound Paper, Junior Size Project Planning Sheets - Premium 120gsm Heavyweight Notebook & Planner Refills - 8 Discs, 5.5 x 8.5 in - Punched for Circa, Arc, TUL (50 Sheets) is the combination of thoughtfully designed design and project planning. Users benefit from thoughtful design, making it a strong pick among planner refills options.

Best For

Geared toward daily routines, the Eleven Discs Discbound Paper, Junior Size Project Planning Sheets - Premium 120gsm Heavyweight Notebook & Planner Refills - 8 Discs, 5.5 x 8.5 in - Punched for Circa, Arc, TUL (50 Sheets) brings thoughtfully designed build quality and consistent reliable performance.

Quick Summary

The Eleven Discs Discbound Paper is a Planner Refills product by ElevenDiscs. Color: Project Planning. Sheet Size: 5.5 x 8.5 Inches. Brand: Eleven Discs. Sheet Count: 50. Product Dimensions: 8.5"L x 5.5"W. Price: $29.62.

Product Specifications

Specification Details
Color Project Planning
Sheet Size 5.5 x 8.5 Inches
Brand Eleven Discs
Sheet Count 50
Product Dimensions 8.5"L x 5.5"W

Made with care

Great value

Elegant design

Quality materials

Details

This product is crafted with quality materials to ensure durability and performance. Designed with your convenience in mind, it seamlessly fits into your everyday life.

Shipping & Returns

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.

We are committed to ensuring a positive shopping experience for all our customers. If for any reason you wish to return an item, we invite you to reach out to our team for assistance, and we will evaluate every return request with care and consideration.

Shop The Full Collection

"Package of Two" Royal Scriptor, Scriptor II, Signet 10, 45 and Others

#10 Envelopes Letter Size Self Seal | 1, 000 Business Mailing Security Peel and

#10 Envelopes Letter Size Self Seal | 1, 050 Business Mailing Security Peel and

#10 Envelopes Letter Size Self Seal | 100 Business Mailing Security Peel and